Fire Crystal Buildings
Fire Crystal Marksman Camp
This building trains and promotes Fire Crystal Marksmen. It unlocks after the Furnace enters the Fire Crystal era. It can be upgraded to the same level as the Furnace and is usually one of the prerequisites for the next Furnace level. Each upgrade increases Training Capacity (the number of troops trained per batch), reduces training time, and increases your power. Higher building levels unlock higher-tier troops. After unlocking T5 troops, you can promote lower-tier troops to the highest tier currently available. Camp Expansion research in the Research Center's Growth tab further increases Training Capacity. Training Tools research in the same tab reduces the time required to train a batch of troops.
- Category
- Fire Crystal Buildings
- 50
Official table basis
| Level | Prerequisites | Build Cost | Construction Time | Building Power |
|---|---|---|---|---|
| 30-1 | Furnace FC-1 | 23M 23M 4.7M 1.1M 59 | 1d 01:12:00 | 316,180 |
| 30-2 | Furnace FC-1 | 23M 23M 4.7M 1.1M 59 | 1d 01:12:00 | 327,660 |
| 30-3 | Furnace FC-1 | 23M 23M 4.7M 1.1M 59 | 1d 01:12:00 | 339,140 |
| 30-4 | Furnace FC-1 | 23M 23M 4.7M 1.1M 59 | 1d 01:12:00 | 350,620 |
| FC 1 | Furnace FC-1 | 23M 23M 4.7M 1.1M 59 | 1d 01:12:00 | 362,100 |
| FC1-1 | Furnace FC-2 | 25M 25M 5M 1.2M 71 | 1d 08:24:00 | 373,580 |
| FC1-2 | Furnace FC-2 | 25M 21M 5M 1.2M 71 | 1d 08:24:00 | 385,060 |
| FC1-3 | Furnace FC-2 | 25M 25M 5M 1.2M 71 | 1d 08:24:00 | 396,540 |
| FC1-4 | Furnace FC-2 | 25M 25M 5M 1.2M 71 | 1d 08:24:00 | 408,020 |
| FC 2 | Furnace FC-2 | 25M 25M 5M 1.2M 71 | 1d 08:24:00 | 419,500 |
| FC2-1 | Furnace FC-3 | 27M 27M 5.5M 1.3M 107 | 1d 15:36:00 | 430,980 |
| FC2-2 | Furnace FC-3 | 27M 27M 5.5M 1.3M 107 | 1d 15:36:00 | 442,460 |
| FC2-3 | Furnace FC-3 | 27M 27M 5.5M 1.3M 107 | 1d 15:36:00 | 453,940 |
| FC2-4 | Furnace FC-3 | 27M 27M 5.5M 1.3M 107 | 1d 15:36:00 | 465,420 |
| FC 3 | Furnace FC-3 | 27M 27M 5.5M 1.3M 107 | 1d 15:36:00 | 476,900 |
| FC 3-1 | Furnace FC-4 | 28M 28M 5.7M 1.4M 126 | 1d 19:12:00 | 489,540 |
| FC 3-2 | Furnace FC-4 | 28M 28M 5.7M 1.4M 126 | 1d 19:12:00 | 502,180 |
| FC 3-3 | Furnace FC-4 | 28M 28M 5.7M 1.4M 126 | 1d 19:12:00 | 514,820 |
| FC 3-4 | Furnace FC-4 | 28M 28M 5.7M 1.4M 126 | 1d 19:12:00 | 527,460 |
| FC 4 | Furnace FC-4 | 28M 28M 5.7M 1.4M 126 | 1d 19:12:00 | 540,100 |
| FC 4-1 | Furnace FC-5 | 29M 29M 5.9M 1.4M 150 | 2d 02:24:00 | 552,740 |
| FC 4-2 | Furnace FC-5 | 29M 29M 5.9M 1.4M 150 | 2d 02:24:00 | 565,380 |
| FC 4-3 | Furnace FC-5 | 29M 29M 5.9M 1.4M 150 | 2d 02:24:00 | 578,020 |
| FC 4-4 | Furnace FC-5 | 29M 29M 5.9M 1.4M 150 | 2d 02:24:00 | 590,660 |
| FC 5 | Furnace FC-5 | 29M 29M 5.9M 1.4M 150 | 2d 02:24:00 | 603,300 |
| FC 5.1 | Furnace FC-6 | 33M 33M 6.7M 1.6M 90 4 | 2d 06:00:00 | 616.820 |
| FC 5.2 | Furnace FC-6 | 33M 33M 6.7M 1.6M 90 4 | 2d 06:00:00 | 630.340 |
| FC 5.3 | Furnace FC-6 | 33M 33M 6.7M 1.6M 90 4 | 2d 06:00:00 | 643.860 |
| FC 5.4 | Furnace FC-6 | 33M 33M 6.7M 1.6M 90 4 | 2d 06:00:00 | 657.380 |
| FC 6 | Furnace FC-6 | 33M 33M 6.7M 1.6M 45 9 | 2d 06:00:00 | 670.990 |
| FC 6.1 | Furnace FC-7 | 38M 38M 7.6M 1.9M 108 6 | 2d 16:48:00 | 684.420 |
| FC 6.2 | Furnace FC-7 | 38M 38M 7.6M 1.9M 108 6 | 2d 16:48:00 | 697.940 |
| FC 6.3 | Furnace FC-7 | 38M 38M 7.6M 1.9M 108 6 | 2d 16:48:00 | 711.460 |
| FC 6.4 | Furnace FC-7 | 38M 38M 7.6M 1.9M 108 6 | 2d 16:48:00 | 724.980 |
| FC 7 | Furnace FC-7 | 38M 38M 7.6M 1.9M 54 13 | 2d 16:48:00 | 738,500 |
| FC 7.1 | Furnace FC-8 | 46M 46M 9.3M 2.3M 108 9 | 3d 00:00:00 | 752,020 |
| FC 7.2 | Furnace FC-8 | 46M 46M 9.3M 2.3M 108 9 | 3d 00:00:00 | 765,540 |
| FC 7.3 | Furnace FC-8 | 46M 46M 9.3M 2.3M 108 9 | 3d 00:00:00 | 779,060 |
| FC 7.4 | Furnace FC-8 | 46M 46M 9.3M 2.3M 108 9 | 3d 00:00:00 | 792,580 |
| FC 8 | Furnace FC-8 | 46M 46M 9.3M 2.3M 54 19 | 3d 00:00:00 | 806,100 |
| FC 8.1 | Furnace FC-9 | 50M 50M 10M 2.5M 126 13 | 1d 22:48:00 | 820.580 |
| FC 8.2 | Furnace FC-9 | 50M 50M 10M 2.5M 126 13 | 1d 22:48:00 | 835.060 |
| FC 8.3 | Furnace FC-9 | 50M 50M 10M 2.5M 126 13 | 1d 22:48:00 | 849.540 |
| FC 8.4 | Furnace FC-9 | 50M 50M 10M 2.5M 126 13 | 1d 22:48:00 | 864.020 |
| FC 9 | Furnace FC-9 | 50M 50M 10M 2.5M 63 27 | 1d 22:48:00 | 878.500 |
| FC 9.1 | Furnace FC-10 | 59M 59M 11M 2.9M 157 31 | 3d 00:00:00 | 892.980 |
| FC 9.2 | Furnace FC-10 | 59M 59M 11M 2.9M 157 31 | 3d 00:00:00 | 907.460 |
| FC 9.3 | Furnace FC-10 | 59M 59M 11M 2.9M 157 31 | 3d 00:00:00 | 921.940 |
| FC 9.4 | Furnace FC-10 | 59M 59M 11M 2.9M 157 31 | 3d 00:00:00 | 936.420 |
| FC 10 | Furnace FC-10 | 59M 59M 11M 2.9M 78 63 | 3d 00:00:00 | 950.900 |